Sample Assessment  ·  Powered by InfoCorvus ROAD

Here's what your Oracle EBS data looks like — and the risk and effort it's costing you.

An illustrative sample of the Value Global EBS Data Lifecycle Assessment: your data footprint, what's still active vs. dormant, where the exposure and operational drag sit, and a phased roadmap.

Explore the data → Top 10 archiving opportunities → Request your EBS Assessment
Illustrative sample. Figures are representative of a typical Oracle EBS footprint and are shown for illustration only. Your own assessment runs against your metadata — no production data leaves your environment.
YOUR ACTIVE PRODUCTION DATA COULD SHRINK

Why this matters — risk, operations, and time

Storage is cheap; the real cost of a bloated EBS is exposure, operational drag, and time. Removing dormant data from production attacks all three.

Reduce risk exposure

Cut operational effort

Save time & restore performance

Lower storage cost follows too — but it's a secondary benefit, not the reason to act. The case is risk and operations.

Your Data Cholesterol Reading

InfoCorvus's analysis reads an EBS footprint the way a blood panel reads cholesterol — how much is dormant, closed-period "buildup" that can be cleared off production versus active data that has to stay. Most of an aging EBS is low-access historical data, carried in production and backed up as if it were live. Click any segment, then drill into the schemas and tables behind it.

Open the data explorer →

Unchecked, the problem compounds

Projected footprint growth — every terabyte added is more to secure, back up, clone, and migrate. Backups, DR windows and M&A integration all slow as it grows.

Projection is illustrative, anchored to the measured current footprint.

What keeps it growing
  • Business as usual — every order, invoice and GL entry adds rows, day after day.
  • M&A & carve-outs — acquired ledgers, orgs and operating units fold in.
  • Regulatory retention — tax and audit mandates keep years of closed-period history online.
  • Process & system change — new modules, localizations and integrations add structures and staging tables that rarely get purged.

Your phased roadmap

Phase 1 · Weeks 1–2

Assess

Footprint profile, archive candidates, risk & exposure areas — the report you're looking at, on your data.

Phase 2 · Weeks 3–8

Archive

Configure ROAD adapters for top modules; validate before purge; move dormant data off production to lower-cost tiers — queryable, not deleted.

Phase 3 · Ongoing

Retire & Retain

Decommission legacy environments after a one-time extract; stand up searchable, audit-grade historical access on a lower-cost data source of your choice; optional continuous archiving.

Request your EBS Assessment See the full data drill-down →